(Construction) - On August 26, the Special Working Group of the Ministry of Construction, led by Deputy Minister Le Quang Hung had inspected the prevention and control of the Covid-19 epidemic at some southern provinces with heavy infected such as Ho Chi Minh City, Dong Nai, Binh Duong and Long An.
The delegation inspected the construction site of Thu Thiem 2 bridge |
The Group focused on inspecting the assurance of urban technical infrastructure facilities such as water supply, drainage, waste collection and treatment; constructing field hospitals and other construction works for Covid-19 prevention and control under emergency orders; inspecting the crematorium; checking and ensuring the operation of electromechanical systems in apartments and houses.
The Group noted that the construction of key works at the present time is a great effort of the relevant units. However, it is also necessary to do well all disease prevention at the construction site in accordance with the instructions of the Ministry of Construction and the Ministry of Health; Fully apply necessary medical equipments to support epidemic prevention and control in accordance with regulations and guidelines of the health sector such as temperature measurement, medical masks, hand sanitizer, antiseptic solution hands, testing and so on.
By Khanh Phuong
Theo